Tips and Ticks BODMAS Rule


Tips and Ticks BODMAS Rule

BODMAS is an acronym and it stands for Bracket, Of, Division, Multiplication, Addition and Subtraction. 

This explains the order of operations to solve an expression. According to Bodmas rule, if an expression contains brackets ((), {}, []) we have to first solve/simplify the bracket followed by of (powers and roots etc.), then division, multiplication, addition and subtraction from left to right. 

Example :

7 + (6 × 52 + 3) =   7 + (6 × 25 + 3)

7 + (150 + 3)

7 + (153)

7 + 153

Ans: 160.

Logo
Logo
Problems on Train with Explanation and Shortcuts

Formula :  .

Train Speed = Distance / Time.


Points to Remember .

To change km/hr into m/sec, we need to multiply it by 5 / 18. .

Example:.

90 km/hr means.

90 x 5 / 18.

= (5 x 5 ).

= 25 m/sec.

And if we need to convert m/sec into km/hr, we multiply it by 18 / 5.

Example:.

90 m/sec means.

90 x 18 / 5.

= ( 18 x 18 ).

= 324 km/hr.

Time taken by a train of length l meters to pass a pole or standing man or a signal post is equal to the time taken by the train to cover l meters.
Time taken by a train of length l meters to pass a stationary object of length b meters is the time taken by the train to cover (l + b) meters.
Suppose two trains or two objects bodies are mo...

Open

GK പഠനത്തിനു സഹായകരമായ കോഡുകൾ

1) ഇന്ത്യയിലെത്തിയ വിദേശികൾ അവർ വന്ന ക്രമത്തിൽ = PDEF .

Portagese, Dutch,English, French.


2) വൈറ്റമിനുകൾ.

കൊഴുപ്പിൽ ലയിക്കുന്നവ= ADEK.

ജലത്തിൽ  ലയിക്കുന്നവ = BC.


3) കൂടുതൽ States അധികാരപരിധിയിലുള്ള ഹൈകോടതി = ഗുഹാവതി. ഏതൊക്കെ?.

States  Code = MAAN ( മിസോറം,അരുണാചൽപ്രദേശ്, അസം,നാഗാലാൻഡ്‌ ).


4) യുദ്ധങ്ങൾ അവസാനിപ്പിച്ച സന്ധികൾ.

കർണാട്ടിക് യുദ്ധങ്ങൾ...

Open

Time and Work Problems - Shortcut Tricks and Formulas

Problems Type 1: .

A can finish work in X days. .

B can finish work in Y days.


Both can finish in Z days = (X*Y) / (X+Y). .


Problems Type 2: .

Both A and B together can do work in T days.

A can do this work in X days.


then, B can do it in Y days = (X*T) / (X-T) .


Problems Type 3: .

A can finish work in X days.

B can finish work in Y days.

C can finish work in Z days.


Together they can do work in T days = (X*Y*Z)/ [(X*Y)+(Y*Z)+(X*Z)] .


Problems Type 4: .

A can finish work in X days.

B can finish work in Y days.


A*X = B*Y.

...

Open